.

Unit Profile

Bangalore Unit is the first Plant of ITI set up in 1948. With its, vertically integrated, state-of-the-art infrastructure a vast range of telecom products are manufactured. They include digital switches (large, medium, small), Digital Microwave equipment, optic fibre equipments, satellite communication equipment, access products, terminal equipments.

Areas of Business

Telecom Equipment Manufacture for Defence and Civilians applications

Installation & Communication

Turnkey Solutions

IT Networks

Diversified Products

Products/Services

SMT Line

ENVIRONMENTAL TEST LABORATORY

Switching : CSN-MM,C-DOT,ISDN and PABX

Access: WLL/CDMA INFRA, Broadband CorDECT(EDWAS),Antenna GSM/CDMA

Transmission: IDR SATCOM Microwave

Terminal Equipments:Caller ID Phones

Defence Equipments: ORDERWIRE SECRECY(OWS) , ANANDA MK II BEU, MIL PCM SECRECY , L VSAT 5B/5C TELEPHONES, PRIMARY MUX

ASCON

EPBT

ADSL-CPEs, Secrecy Equipments

INFO KIOSKS and Desktop Computers




PCM Secrecy



OWS



TNSR



ADSL MODEM


Facilities

Mechanical Fabricaton and Assembly

Machines Available :

CNC Turret Punch Press (30 tons), NC Pressbrakes (upto 120 tons), CNC Shearing (2.5 mtrs) and General purpose machines Capability: Handling sheet metal work of 2mm thickness of stainless steel, 2.5mm MS & 3.2mm Aluminium Capacity: Process about 100 tons of Sheet Metal per month

Through-Hole Component Assembly

Capability :Dual wave and Nitrogen atmosphere wave soldering

Capacity : 36 million components per annum


PCB Manufacturing

Capability :Single Layer to 4 Layer

Capacity : 3000 Sq.Metres per annum


Testing Facilities

In-Circuit Testers (upto 2000 nodes) Capability :Detects open, short, continuity, correctness of the components with respect to Orientation, Value, etc

Capacity : 1,50,000 cards per year (average) Functional testing for cards System Testing

Plastic Injection Technology

Capability: 25 to 300 tons

Capacity: 0.5 million shots per annum

Tool Room

Capability:Manufacture and maintenance of moulding tools, press tools, jigs & fixtures

Capacity:Supporting in-house requirements

Finishing

Capability: Electroplating and Powder coating facilities

Capacity: Supporting in-house fabrication

Nickle Plating
Non-cyanide plating
Upgraded Zinc Phosphating plant

Other Support Facilities

  • EMI Shielded Chamber
  • Electrical Test Lab.
  • Mechanical Test Lab.
  • Chemical Test Lab
  • Environmental Testing Facility

Total Turnkey Solutions

  • CDMA Network : 4.4 Million Lines - Supply, Installation and Commissioning for BSNL
  • Army Static Communication Network (ASCON) for Defence Forces (Covering entire country)
  • CIVICON PROJECT for Ministry of Home Affairs (Turn-key Network Implementation)
  • CARNATION Project for Indian ARMY (Wide Area Strategic Network)
  • IDR Project for BSNL
  • MCPC VSAT for BSNL
  • Point to Point Satellite based Links for RCPO
  • LICO VSAT for Indian ARMY
  • SCPC DAMA Equipment

Bangalore Unit


Contact Details

Y.MURALIDHAR
Additional General Manager,
Bangalore Plant and R&D
ITI Limited, Dooravaninagar,
Bangalore-560016, Karnataka,India.

Phone : 080-25651340, 080-28503902
Fax : 080-25650400

Email : ymuralidhar_bgp@itiltd.co.in

Quality system

ISO 9001:2008

ISO 14001 :2004

This is the official website of ITI Limited, a Public Sector Undertaking under the Ministry of Communication and Information Technology, Government of India.


Last Updated
18th Nov 2017